Finish the list. Don’t start any new ones (not including whatever I’ve forgotten to include in these areas for the purpose of making these spaces finished/livable) unless these are done and Rachel agrees the new project is necessary.
Additional comment 2/15/2025: I should also note that Rachel has been helping with these and it’s not all me.
- Playhouse – House
- Playhouse – Ladder
- Playhouse – Swings and monkey bars
- Downstairs – Fix flooring
- Downstairs – Fix hole in ceiling; remove swing and boards
Downstairs – Trim work in main room(Feb. 22)- Downstairs – Trim work in bathroom
Downstairs – Touch up painting in main room(Early March)- Downstairs – Touch up painting in bathroom
- Downstairs – Fix wobbly toilet in bathroom
- Downstairs – Add door to water heater closet
- Downstairs – Paint over awful yellow paint
- Downstairs – Install fireplace
- Downstairs – Complete built-in bookshelves
- Downstairs – Ceiling drywall in office
- Downstairs – Storage closet light
- Downstairs – New CAT5 jacks near TV in office (electrician)
- Downstairs – New power outlet near TV in office (electrician)
- Downstairs – Seal doors
- Downstairs – Get rid of old furniture
- Downstairs – New furniture moved in
- Back porch – Bug netting
- Back porch – Figure out how to get rid of blue painters tape
- Back porch – Touch up painting
Living room – New fan install(Feb. 1)Master bedroom – Rehang my closet door(Apr. 13)- Spare bedroom – Reconfigure
Spare bedroom – Buy new furniture(March)- Dining room – Paint
Dining room – Fix curtain rod(Feb. 10)- Outside – Junk cleanup