House Projects Tracker

Finish the list. Don’t start any new ones (not including whatever I’ve forgotten to include in these areas for the purpose of making these spaces finished/livable) unless these are done and Rachel agrees the new project is necessary.

Additional comment 2/15/2025: I should also note that Rachel has been helping with these and it’s not all me.

  • Playhouse – House
  • Playhouse – Ladder
  • Playhouse – Swings and monkey bars
  • Downstairs – Fix flooring
  • Downstairs – Fix hole in ceiling; remove swing and boards
  • Downstairs – Trim work in main room (Feb. 22)
  • Downstairs – Trim work in bathroom
  • Downstairs – Touch up painting in main room (Early March)
  • Downstairs – Touch up painting in bathroom
  • Downstairs – Fix wobbly toilet in bathroom
  • Downstairs – Add door to water heater closet
  • Downstairs – Paint over awful yellow paint
  • Downstairs – Install fireplace
  • Downstairs – Complete built-in bookshelves
  • Downstairs – Ceiling drywall in office
  • Downstairs – Storage closet light
  • Downstairs – New CAT5 jacks near TV in office (electrician)
  • Downstairs – New power outlet near TV in office (electrician)
  • Downstairs – Seal doors
  • Downstairs – Get rid of old furniture
  • Downstairs – New furniture moved in
  • Back porch – Bug netting
  • Back porch – Figure out how to get rid of blue painters tape
  • Back porch – Touch up painting
  • Living room – New fan install (Feb. 1)
  • Master bedroom – Rehang my closet door (Apr. 13)
  • Spare bedroom – Reconfigure
  • Spare bedroom – Buy new furniture (March)
  • Dining room – Paint
  • Dining room – Fix curtain rod (Feb. 10)
  • Outside – Junk cleanup